Home Renovation Toronto: Kitchen and Bathroom Specialists for Every Neighbourhood
Smart Renovations is the home renovation Toronto contractor that has completed 175+ kitchen and bathroom projects across Riverdale, the Annex, Leslieville, Forest Hill, Etobicoke, and North York since 2017. Fixed quotes, on-time crews, 1-year labour warranty.
WSIB Certified | Licensed Electrician | $5M Liability Insurance | 8x Houzz Award Winner | 4.9/5 on Houzz & Google | HomeStars Verified | CBRB Verified


Winner of 8 Coveted Houzz Awards for SERVICE OF EXCELLENCE 2019 to 2026








Video Testimonials from Toronto Clients
Toronto families have shared video testimonials covering service, professionalism, and results. Their words reflect a consistent experience: a contractor who shows up on time, communicates throughout, and delivers exactly what the written scope described. See what clients say about Smart Renovations.
Serving Toronto from Our Woodbridge Office
Toronto's Housing Stock Requires Property-Specific Planning
Planning a home renovation in Toronto means working with housing stock that spans more than a century of construction across dozens of distinct neighbourhoods. Each property carries different structural standards, different layouts, and different problems that accumulate over time. Before we design anything, we assess the specific home we are walking into.
Victorian and Edwardian Semis: Riverdale, Cabbagetown, and the Annex Heritage home renovation in Toronto starts here. Builders constructed these semis between the 1880s and 1920s, and every one carries original knob-and-tube wiring, galvanised supply lines, 2-inch drain stacks, and subfloors that have shifted through 100 years of Toronto winters. Kitchens are small and closed off, designed before open-concept living existed. Bathrooms carry cast-iron tubs, single vanities, and tile that has been regrouted past restoration. Many properties sit within heritage conservation districts, requiring heritage impact documentation alongside standard permit applications. Before any scope is finalised, we confirm what the existing rough-in can support and what needs correcting.
Post-War Bungalows and Semis: Etobicoke, Scarborough, and East York Contractors put up these homes rapidly through the 1940s and 1960s, giving them larger footprints than Victorian stock but their own set of challenges: asbestos-containing floor tile in many 1950s and 1960s bathrooms, copper supply lines that have pinholed through mineral corrosion, and kitchens designed for a different era of cooking and family size. Removing a wall for an open kitchen often reveals load-bearing structure that requires a beam and engineering sign-off. We identify all of this before the scope is written.
Family Homes: Bloor West Village, High Park, and North York Builders put up these homes through the 1970s and 1980s across Toronto’s established residential streets. Kitchens carry original cabinetry that has reached the end of its lifespan, aging laminate countertops, and layouts that predate the island-centred kitchen. Bathrooms carry single vanities and builder tile that fails once the original grout is compromised. The structure is generally solid. Every surface finish requires replacement.
Condos: Liberty Village, King West, Distillery District, and Downtown Core Condo renovation in Toronto requires a different planning approach entirely. Space is the binding constraint in every room. Kitchens average 80 to 120 square feet. Bathrooms run compact. Every design decision has to earn its place. Condo buildings also require condo board approval in writing, elevator booking for material deliveries, and noise-restricted work hours that vary by building. We include all building requirements in the project schedule before construction starts.
Executive Homes: Forest Hill, Rosedale, and Lawrence Park Large primary ensuites, butler’s pantries, and formal dining rooms define these properties. Kitchens often span 250 square feet and above. Primary bathrooms carry the footprint for a full spa-level rebuild. Heritage designation applies to some properties in these neighbourhoods, which adds documentation requirements to the permit process.
Kitchen Remodelling Toronto: Our On-Site Process
We design every Toronto kitchen from a site visit, not from a showroom catalogue. The plan starts with how your household uses the space, what fails daily, and what the room needs to do differently once construction is complete.
Every kitchen project we take on in Toronto follows the same fixed sequence. We assess the structural walls, locate the load-bearing elements, and confirm what the plumbing and electrical rough-in will support before we make a single design decision. This is why our quotes do not change after you sign: we look for structural surprises at the start, not mid-project.
Typical Toronto kitchen remodelling work includes:
- Load-bearing wall removal and structural beam engineering for open-concept layouts
- Full cabinet strip-out and custom cabinetry installation with full-height upper cabinets
- Quartz or natural stone countertops with waterfall island edges
- Dedicated 20-amp electrical circuits for modern appliances
- Plumbing rough-in relocation for island sink positions
- Gas line work for range and cooktop installations
- Under-cabinet lighting, pot lights, and statement fixture installation
- Backsplash tile from floor to ceiling on feature walls
- Heritage documentation preparation for Annex, Cabbagetown, and Rosedale properties
Every kitchen we complete in Toronto carries a 3D design approval before ordering, a fixed price that does not change, and a 1-year labour warranty from the day we hand the room back to you.
Bathroom Remodelling Toronto: Structure First, Finishes Second
A Toronto bathroom that looks like a cosmetic refresh from the doorway often needs a full rebuild once the tile comes off. We assess every bathroom on-site before any design work begins: subfloor condition, waterproofing integrity, plumbing stack position, ventilation run, and fixture layout all determine what the project actually requires.
We do not resurface over failing systems. Every bathroom we remodel in Toronto starts with the subfloor, builds up with a proper waterproofing membrane, and finishes with materials specified for the household using the room every day.
Typical Toronto bathroom remodelling work includes:
- Full strip-out to studs and subfloor
- Waterproofing membrane installation before we set a single tile
- Double vanity reconfiguration where the footprint allows
- Separate tub and shower enclosure with frameless glass
- Radiant heated floor installation on a dedicated electrical circuit
- Drain relocation and plumbing rough-in repositioning where required
- New exhaust ventilation run to exterior
- Large-format tile throughout with minimal grout lines
- Curbless shower entry with linear drain for accessibility builds
- Grab bars set into structural blocking during rough-in stage
- Asbestos testing and abatement coordination for pre-1980 homes where required
Every bathroom we complete in Toronto carries a 3D design approval before ordering, a fixed price that does not change, and a 1-year labour warranty from the day we hand the room back to you.
Toronto Building Permits: What Is Required and How We Manage It
The City of Toronto requires permits for any renovation involving structural changes, plumbing relocation, electrical upgrades, HVAC modifications, or additions. All applications go through the City of Toronto ePermits online portal. Properties in heritage conservation districts, including Cabbagetown, Rosedale, the Annex, and parts of Leslieville, carry additional documentation requirements reviewed by the City’s Heritage Planning team before permit issuance.
Toronto’s permit processing timelines currently run 3 to 6 weeks for most residential renovation applications, with heritage-adjacent submissions taking longer. We prepare complete drawing packages, confirm compliance with the Toronto Zoning By-law before submission, and submit through our registered City of Toronto portal account.
Kitchen remodelling permits cover: plumbing relocations and new drain connections, dedicated electrical circuits and panel upgrades, load-bearing wall removal for open-concept layouts, and gas line work for range or cooktop installations.
Bathroom remodelling permits cover: toilet, tub, and shower drain relocations, new exhaust ventilation systems, radiant heated floor electrical installations, and curbless shower conversions.
We schedule every building inspection through the City’s online booking system, including framing, rough-in plumbing, rough-in electrical, and final, and attend each one in person. You never contact the Building Department directly.
When to Book Your Toronto Home Renovation
Spring (March to May) The most active booking window across Toronto. Permit applications process on schedule, supplier yards carry fresh inventory, and homeowners in North York and Etobicoke target project completion before the school year ends. Lead times for popular trades fill from March onward. Downtown condo owners benefit from lighter elevator competition in spring before summer move-in season peaks.
Summer (June to August) Peak season. Forest Hill and Rosedale estate projects and large Annex kitchen remodels fill the calendar quickly. Downtown condo buildings restrict freight elevator bookings heavily during summer move-in periods, which extends lead times for condo renovation starts. Book early to secure your trade sequence.
Fall (September to November) The most consistent window across all Toronto housing types. Suppliers carry full inventory, trades are focused, and homeowners in Bloor West Village and High Park aim to complete projects before the December holiday period. Heritage-adjacent permit applications benefit from faster City review as summer application volumes drop.
Winter (December to February) Interior kitchen and bathroom remodelling runs without weather delays. Downtown condo elevator bookings are easiest to secure. Fewer competing projects in the queue result in tighter timelines and more focused on-site management.
Project Timelines and Investment in Toronto
Every home improvement project in Toronto is unique, but homeowners can expect timelines and Toronto renovation costs to vary based on property type, permit requirements, and design complexity.
Kitchen Renovations
- Cosmetic updates: 4 to 6 weeks, $25,000 to $35,000. Ideal for North York and Etobicoke family homes needing fresh cabinetry, new countertops, and upgraded lighting without structural changes.
- Full redesigns: 8 to 10 weeks, $40,000 to $80,000. Common in Riverdale and Annex semis where we remove walls for open-concept layouts, relocate plumbing, and install new appliances.
- Heritage and estate kitchens: 10 to 12 weeks, $100,000+. Rosedale and Forest Hill projects often include custom cabinetry, high-end appliances, heritage documentation, and bespoke finish selections.
Bathroom Renovations
- Standard updates: 2–4 weeks, $15,000–$25,000. Perfect for compact bathrooms in Leslieville row houses and Liberty Village condos needing new tile, lighting, and vanities.
- Full remodels: 3–5 weeks, $25,000–$45,000. Common in High Park and Bloor West Village family bathrooms, where layouts are reconfigured for double vanities and improved storage.
- Spa-style retreats: 5–7 weeks, $50,000–$85,000+. Forest Hill and Lawrence Park luxury bathrooms with heated floors, freestanding tubs, steam showers, and custom tilework.
We base all figures on completed Toronto projects of similar scope. After the on-site assessment, we provide final pricing and a confirmed timeline once we have reviewed your home’s specific structural conditions, permit requirements, and material selections.
How a Toronto Home Renovation Works With Smart Renovations
Consultation
We visit your Toronto home, measure the space, and listen to what is not working. For older properties in the Annex, Cabbagetown, or Riverdale, we check for heritage constraints and structural conditions that need addressing before remodelling begins. No design fee. No obligation after the first meeting.
Design and Permits
We produce a 3D design showing your new kitchen or bathroom with exact materials, cabinetry layout, and finishes confirmed before we order anything. We then submit the permit application through the City of Toronto ePermits portal, prepare heritage documentation where the property requires it, and give you a confirmed construction start date once approval is received. For condo projects, we obtain written property management approval and book the freight elevator schedule at this stage.
Construction
Licensed tradespeople work in a fixed sequence: structural work first, then plumbing rough-in, electrical, drywall, flooring, cabinetry, countertops, tile, and fixtures. The site stays clean daily. You have direct access to your project lead throughout and receive updates at every inspection stage.
Final Walkthrough and Warranty
We walk through every completed detail together. Your 1-year labour warranty starts that day. Anything requiring attention within the first year, whether a tile lift, cabinet hinge, or caulking separation, we return and correct at no charge.
Book Your Toronto Home Renovation Assessment
Most Toronto homeowners who contact us have already spent months thinking about the renovation. The on-site assessment is what turns that thinking into a fixed plan, a confirmed timeline, and a price that does not change. It costs nothing, takes 60 to 90 minutes, and gives you everything you need to make a decision.
We visit your property, assess your plumbing, structural conditions, and permit requirements in person, and give you a written scope before you commit to anything. The sooner you book, the sooner we can confirm your construction start date, which matters during peak season when trade schedules fill weeks in advance.
8A-40 Innovation Dr, Woodbridge, ON L4H 0T2
Call: 905-205-1766 | 647-996-8287
Frequently Asked Questions About Home Renovation Toronto
A cosmetic kitchen update in a North York or Etobicoke family home runs $25,000 to $35,000. A full kitchen redesign in a Riverdale or Annex semi runs $40,000 to $80,000. A Forest Hill or Rosedale custom kitchen starts at $100,000. Bathroom remodels range from $15,000 for a standard East York or Scarborough refresh to $85,000+ for a Forest Hill or Rosedale spa-style primary ensuite. Every Smart Renovations quote is fixed: the number does not change after you sign.
Most remodelling work involving plumbing, electrical, gas lines, or structural changes requires a permit from the City of Toronto. Heritage conservation district properties require additional documentation from the City's Heritage Planning team. We prepare and submit every application through the ePermits portal, attend all inspections, and manage every sign-off. You do not contact the City directly at any stage.
Bathroom remodels run 2 to 5 weeks. Kitchen renovations run 4 to 12 weeks depending on scope. Permit processing through the City of Toronto currently takes 3 to 6 weeks for standard residential renovation applications, with heritage submissions taking longer. We account for this in your confirmed start date from day one.
Yes. Our Woodbridge office at 8A-40 Innovation Dr, Woodbridge, ON L4H 0T2 is minutes from west Toronto and Etobicoke. We serve all Toronto neighbourhoods directly from this office, including downtown condos, North York family homes, Scarborough bungalows, and Forest Hill estates.
Every completed project carries a 1-year labour warranty. If a tile lifts, a cabinet hinge fails, or caulking separates within the first year, we return and fix it at no charge.
Yes. We coordinate both permit applications through the City of Toronto ePermits portal at the same time and sequence the City's inspections so your overall project timeline stays as tight as possible.
Properties in heritage conservation districts, including Cabbagetown, Rosedale, the Annex, and parts of Leslieville, need heritage impact documentation that the City's Heritage Planning team reviews before issuing permits. We prepare that documentation as part of our permit submission. Inside these homes, we also assess and address original plumbing, wiring, and structural conditions before we finalise any design.
